{"id":1935,"date":"2022-12-01T15:31:23","date_gmt":"2022-12-01T14:31:23","guid":{"rendered":"https:\/\/www.enys-power.com\/projets\/construction-of-a-potable-water-treatment-plant-in-la-me\/"},"modified":"2023-06-02T16:03:39","modified_gmt":"2023-06-02T14:03:39","slug":"construction-of-a-potable-water-treatment-plant-in-la-me","status":"publish","type":"project","link":"https:\/\/www.enys-power.com\/en\/projects\/construction-of-a-potable-water-treatment-plant-in-la-me\/","title":{"rendered":"Construction of a potable water treatment plant in La M\u00e9"},"content":{"rendered":"<section class=\"ps-block ps-block--heading js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<h3><strong>Project<\/strong><\/h3>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--paragraph js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<p class=\"wp-block-paragraph\">Since 2018, BESIX has been in charge of building the sites and of the various works (earthworks, foundations, civil engineering, etc.) in close collaboration with VEOLIA WATER STI, in charge of project design and supervision. <\/p>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--paragraph js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<p class=\"wp-block-paragraph\">Today, the potable water treatment plant treats about 240,000 m\u00b3 of river water per day and is located on the road to Grand Al\u00e9p\u00e9, 40 kilometres north of Abidjan.<\/p>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--heading js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<h3><strong>Enys Power Added Value<\/strong><\/h3>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--paragraph js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<p class=\"wp-block-paragraph\">ENYS POWER, with the support of its partner SANERGRID, was able to offer VEOLIA WATER STI an optimal hydrocarbons management solution for the power transformers on the market. VEOLIA WATER STI validated the ENYS POWER-SANERGRID synergy and a unique and appropriate solution to a highly specific fire risk. <\/p>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--paragraph js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<p class=\"wp-block-paragraph\">The specific constraints of the installation led us to innovate and propose a made to measure offer and key solution to the overall project. <\/p>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--heading js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<h3><strong>Products<\/strong><\/h3>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--paragraph js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<p class=\"wp-block-paragraph\"><em>EXTICOV-LHD fire extinguishing cover<\/em> (Extinguishing grating for electrical transformer pit)<\/p>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--list js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <ul>\n                      \n<li>R\u00e9pond aux risques li\u00e9s aux feux de piscine d\u2019hydrocarbure pour transformateur \u00e9lectrique.<\/li>\n\n                  <\/ul>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--paragraph js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <div class=\"ps-block__body\">\n          <div class=\"ps-block__item\">\n            \n<p class=\"wp-block-paragraph\"><em>PETRO BARRIER hydrocarbon filtration<\/em><em> <\/em>(Vertical drainage system for concrete manhole)<\/p>\n\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n<section class=\"ps-block ps-block--list js-in-view is-animated\">\n  <div class=\"ps-block__container\">\n    <div class=\"ps-block__grid\">\n      <div class=\"ps-block__content\">\n        <ul>\n                      \n<li>R\u00e9pond aux risques li\u00e9s aux eaux de pluies contamin\u00e9es potentiellement aux hydrocarbures et aux cas de fuite majeure.<\/li>\n\n                  <\/ul>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>ENYS POWER has contributed to improving access to potable water for the populations of the Abidjan region. Solicited for its expertise, the company joined the main players BESIX and VEOLIA WATER STI to respond effectively to the client PFO Africa, in order to ramp up the city\u2019s potable water supply.<\/p>\n","protected":false},"featured_media":583,"template":"","location":[92],"class_list":["post-1935","project","type-project","status-publish","has-post-thumbnail","hentry","location-la-me-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enys-power.com\/en\/wp-json\/wp\/v2\/project\/1935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enys-power.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.enys-power.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enys-power.com\/en\/wp-json\/wp\/v2\/media\/583"}],"wp:attachment":[{"href":"https:\/\/www.enys-power.com\/en\/wp-json\/wp\/v2\/media?parent=1935"}],"wp:term":[{"taxonomy":"location","embeddable":true,"href":"https:\/\/www.enys-power.com\/en\/wp-json\/wp\/v2\/location?post=1935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}